Hello. The subject of electrification of Metrolink has come up ocasionally and San Francisco's Peninsula line will probably be electrified within a few years. When this is done, new locomotives will have to be bought. Has the decision been made as to what model to buy for San Francisco? While I realize that the E60C has its short-comings, it did do a fairly respectable job of getting cars and their passenger loads from Point A to Point B on the Northeast Corridor (as far as I know at least, we haven't heard of it blowing a traction motor every other month).. Compare that idea with Ford's tire debacle with Firestone, and the E60C comes out shining better than an industrial grade diamond in my opinion. Correct me if I am wrong, but this is better than the SD45-2 and its trucks derailing. Now if the E60C has the same trucks, then the ballgame changes. Now to the nitty-gritty: Have a;ll the Mexican E60Cs been sold (they were returned to the US, apparently, last year; there were 20 left unsold in August of last year)? The way I hear it, there were six wrecked for various reasons -- it appears (although I don't have any of the details) that none of the accidents were due to on-board mechanical problems. Would the idea of using some (or all) of those units for the time being -- while the system absorbs some of the electrification-related costs -- not have some advantages? On the other hand, how long would the project take? Would there be any advantage in that at all? What I am thinking is that they might -- I emphasize "might" -- be a way of spreading equipment acquisition cost over time. Any thoughts?
Re: Electrification
Author: Pierre A Plauzoles
Date: Thu, 05 Oct 2000 00:00
Date: Thu, 05 Oct 2000 00:00
33 lines
2804 bytes
2804 bytes
Merritt Mullen wrote: > Pierre A Plauzoles at plauzolesp@bigvalley.net wrote on 10/5/00 9:01 PM: > > > Hello. > > > > The subject of electrification of Metrolink has come up ocasionally and > > San Francisco's Peninsula line will probably be electrified within a few > > years. When this is done, new locomotives will have to be bought. Has > > the decision been made as to what model to buy for San Francisco? > > I think you are a bit premature. By the time the Peninsula is electrified > (5-10 years?), the choice of electric locomotive might look entirely > different than it does today. Perhaps the service will switch to EMUs and > not require locomotives. Of course, they probably would want to use the > current cars and that would require locomotives. > > You suggested E60s. I thought E60s were considered to be troublemakers on > the NEC. It seems the preferred loco is the AEM-7, used by both Amtrak and > MARC, and both are happy with it. These are E60c-2s. I haven't heard how happy (or unhappy) Deseret Western [Rangely, in northwestern Colorado to some isolated one-bar (?) town in northeastern Utah] is with theirs, but then they and BMLP -- and TXU (Martin Lake, Texas), the gas -and-electricity utility that serves a good sized chunk of Texas and is headquartered in Dallas -- have picked up some of them. Out of the original 39 ordered, 15 have been sold, and 20 were left as of last August. I wonder what is left now out of those 20 and where they are. Incidentally, depending on the color scheme and how they maintain the locos, those Martin Lake units ought to be good targets for photographers on the lake: the electrics probably go over the bridge (which is some 1500 feet long, if I recall the map scale properly) southeast of the power plant. Anyone know for sure?
Re: Electrification
Author: Richard Mlynarik
Date: Thu, 05 Oct 2000 00:00
Date: Thu, 05 Oct 2000 00:00
72 lines
3965 bytes
3965 bytes
Pierre A Plauzoles wrote: > > Hello. > > The subject of electrification of Metrolink has come up ocasionally and > San Francisco's Peninsula line will probably be electrified within a few > years. When this is done, new locomotives will have to be bought. Not necessarily. Locomotive-hauled passenger trains are, by and large, a thing of the past. (Yes, I know, that would make them a perfect match for the Caltrain Historical Theme Park.) > Has the decision been made as to what model to buy for San Francisco? No, and it would be entirely inappropriate to do so. It should be up to bidders, as part of putting together a package to meet _performance_- based specifications, to decide what sort of rolling stock to provide. Unfortunately, that doesn't seem to be the way Caltrain (the people responsible for the single-bid historical gallery car procurement fiasco, the effectively-single-bid historical locomotive proccurement fiasco and the non-working-overhauled-locomotives fiasco) and its consultants are pushing really hard to just buy locomotives to haul the gallery cars around, and pushing hard to buy something like the Adtranz (now Bombardier) ALP-46 which is on order by (but not delivered to) NJTC. This of course would be a huge mistake. > While I realize that the E60C has its short-comings, it did do a fairly > respectable job of getting cars and their passenger loads from Point A > to Point B on the Northeast Corridor (as far as I know at least, we > haven't heard of it blowing a traction motor every other month).. It depends on what you want to accomplish. If you want to spend a few hundred million dollars stringing wires just so you can say "look! electric trains!" then buying an overweight, inefficient, high-operating-cost, obsolete, low-performance, unmaintainable, unsuccessful locomotive at close to scrap value may be the way to go. If you want to improve transportation on the Peninsula and operate attractive services and care about total cost of ownership and about total return on investment you'd probably do what every other rail system in the world (including Amtrak, even) has done and pass on them. > [...] Now to the nitty-gritty: Have all the Mexican E60Cs been sold (they > were returned to the US, apparently, last year; there were 20 left > unsold in August of last year)? 11 unused locomotives available in original collectible wrapping. > [...] Would the idea of using some (or all) of those units for the > time being -- while the system absorbs some of the > electrification-related costs -- not have some advantages? None I can see. > On the other hand, how long would the project take? Eighteen months if world class contractors were doing it and Caltrain were behind it. Officially six years at Caltrain -- though there isn't actually funding for any of this, so it's all rather academic at this point. In reality? I'm not holding my breath. > Would there be any advantage in that at all? No. Perhaps you'll "save" $40m (compared to buying 10 modern locomotives, but there are ways to save even more by not buying any locomotives at all) but the smart money (which has passed on this fabulous opportunity so far) says the total amortized costs would be higher.
Re: Electrification
Author: david parsons
Date: Fri, 06 Oct 2000 00:00
Date: Fri, 06 Oct 2000 00:00
23 lines
1741 bytes
1741 bytes
In article <39DD4E82.BFA16DFB@bigvalley.net>,
Pierre A Plauzoles <sphinxangelorum@bigfoot.com> wrote:
>Hello.
> [For electifying SF-San Jose (or Gilroy?)]
>Now to the nitty-gritty: Have a;ll the Mexican E60Cs been sold (they
>were returned to the US, apparently, last year; there were 20 left
>unsold in August of last year)? The way I hear it, there were six
>wrecked for various reasons -- it appears (although I don't have any of
>the details) that none of the accidents were due to on-board mechanical
>problems. Would the idea of using some (or all) of those units for the
>time being -- while the system absorbs some of the
>electrification-related costs -- not have some advantages?
I suspect that would depend on just how well suited E60s are for
start-stop service. NJ Transit used them for commuter service for a
while, but apparently had a devil of a time getting them to work
properly in push-pull (and ended up hot-potato(e)ing them as soon as
they could buy ALP44s), so I suspect that they aren't suited.
____
david parsons \bi/ GE seems to have completely lost the ability to
\/ build passenger engines.
Re: Electrification
Author: Aaron Priven
Date: Fri, 06 Oct 2000 00:00
Date: Fri, 06 Oct 2000 00:00
12 lines
1166 bytes
1166 bytes
In article <39DD4E82.BFA16DFB@bigvalley.net>,
sphinxangelorum@bigfoot.com wrote:
>The subject of electrification of Metrolink has come up ocasionally and
>San Francisco's Peninsula line will probably be electrified within a few
>years. When this is done, new locomotives will have to be bought. Has
>the decision been made as to what model to buy for San Francisco?
I'm sure the JPB will buy the best that Lionel makes.
--
Aaron Priven, Oakland, California, USA
aaron@priven.com, http://www.priven.com/
Re: Electrification
Author: Merritt Mullen
Date: Fri, 06 Oct 2000 04:48
Date: Fri, 06 Oct 2000 04:48
20 lines
1949 bytes
1949 bytes
Pierre A Plauzoles at plauzolesp@bigvalley.net wrote on 10/5/00 9:01 PM: > Hello. > > The subject of electrification of Metrolink has come up ocasionally and > San Francisco's Peninsula line will probably be electrified within a few > years. When this is done, new locomotives will have to be bought. Has > the decision been made as to what model to buy for San Francisco? I think you are a bit premature. By the time the Peninsula is electrified (5-10 years?), the choice of electric locomotive might look entirely different than it does today. Perhaps the service will switch to EMUs and not require locomotives. Of course, they probably would want to use the current cars and that would require locomotives. You suggested E60s. I thought E60s were considered to be troublemakers on the NEC. It seems the preferred loco is the AEM-7, used by both Amtrak and MARC, and both are happy with it. Merritt
Re: Electrification
Author: x
Date: Sat, 07 Oct 2000 00:00
Date: Sat, 07 Oct 2000 00:00
18 lines
1439 bytes
1439 bytes
I most strongly resent your inflammatory insult of Lionel Trains. They would never stoop to do business with Caltrain. ;-) Aaron Priven wrote: > In article <39DD4E82.BFA16DFB@bigvalley.net>, > sphinxangelorum@bigfoot.com wrote: > >The subject of electrification of Metrolink has come up ocasionally and > >San Francisco's Peninsula line will probably be electrified within a few > >years. When this is done, new locomotives will have to be bought. Has > >the decision been made as to what model to buy for San Francisco? > > I'm sure the JPB will buy the best that Lionel makes. > > -- > Aaron Priven, Oakland, California, USA > aaron@priven.com, http://www.priven.com/
Re: Electrification
Author: Alan Fishel
Date: Sat, 07 Oct 2000 00:47
Date: Sat, 07 Oct 2000 00:47
16 lines
2129 bytes
2129 bytes
sphinxangelorum@bigfoot.com wrote: > >The subject of electrification of Metrolink has come up ocasionally and > >San Francisco's Peninsula line will probably be electrified within a few > >years. When this is done, new locomotives will have to be bought. Has > >the decision been made as to what model to buy for San Francisco? > > I'm sure the JPB will buy the best that Lionel makes. -- > Aaron Priven, Oakland, California, USA Yes just think if the JPB actually brought in some new Electric MU train sets or even bring in some modern cars like the Metrolink / Stockton San Jose cars to replace the museum pieces they currently operate. The ridership and usage would grow so fast the service might even operate on time and carry moor people faster because of the faster loading etc they would have a hard time selling a BART Line to San Jose.
Re: Electrification
Author: Alan Michelson
Date: Sun, 08 Oct 2000 00:00
Date: Sun, 08 Oct 2000 00:00
22 lines
1850 bytes
1850 bytes
Alan Fishel wrote: > > sphinxangelorum@bigfoot.com wrote: > > >The subject of electrification of Metrolink has come up ocasionally and > > >San Francisco's Peninsula line will probably be electrified within a few > > >years. When this is done, new locomotives will have to be bought. Has > > >the decision been made as to what model to buy for San Francisco? > > > > I'm sure the JPB will buy the best that Lionel makes. > -- > > Aaron Priven, Oakland, California, USA > > Yes just think if the JPB actually brought in some new Electric MU train > sets or even bring in some modern cars like the Metrolink / Stockton San > Jose cars to replace the museum pieces they currently operate. The ridership > and usage would grow so fast the service might even operate on time and > carry moor people faster because of the faster loading etc they would have a > hard time selling a BART Line to San Jose. Bring back the steeple-cabs! http://www.cityofla.org/RAP/grifmet/tt/electra.htm
Re: Electrification
Author: Alan Fishel
Date: Sun, 08 Oct 2000 00:00
Date: Sun, 08 Oct 2000 00:00
31 lines
2417 bytes
2417 bytes
david parsons <orc@pell.portland.or.us> wrote in message news:8rlt01$9bf@pell.pell.portland.or.us... > In article <39DD4E82.BFA16DFB@bigvalley.net>, > Pierre A Plauzoles <sphinxangelorum@bigfoot.com> wrote: > >Hello. > > > [For electifying SF-San Jose (or Gilroy?)] > >Now to the nitty-gritty: Have a;ll the Mexican E60Cs been sold (they > >were returned to the US, apparently, last year; there were 20 left > >unsold in August of last year)? The way I hear it, there were six > >wrecked for various reasons -- it appears (although I don't have any of > >the details) that none of the accidents were due to on-board mechanical > >problems. Would the idea of using some (or all) of those units for the > >time being -- while the system absorbs some of the > >electrification-related costs -- not have some advantages? > > I suspect that would depend on just how well suited E60s are for > start-stop service. NJ Transit used them for commuter service for a > while, but apparently had a devil of a time getting them to work > properly in push-pull (and ended up hot-potato(e)ing them as soon as > they could buy ALP44s), so I suspect that they aren't suited. At least the JPB is consistent. They continue to make the worst possible choice whenever they can. Do you think this is planed, or are they just plain stupid? ____ > david parsons \bi/ GE seems to have completely lost the ability to > \/ build passenger engines.
Re: Electrification
Author: Andy Chow
Date: Mon, 09 Oct 2000 00:00
Date: Mon, 09 Oct 2000 00:00
13 lines
1206 bytes
1206 bytes
Michael Graff wrote in message <8rvimq$cto$1@nnrp1.deja.com>... >Like ACE? Ok, it's not quite level boarding, but bikes can be easily >lifted up one step, and simple low-tech ramps provide wheelchair access. I prefer call it near-level-boarding. -- ---------------------------------------------------------------------------- ---- Bay Area Transit Watch http://members.xoom.com/ntechcentral/transit/
Re: Electrification
Author: david parsons
Date: Mon, 09 Oct 2000 00:00
Date: Mon, 09 Oct 2000 00:00
38 lines
2580 bytes
2580 bytes
In article <nouD5.23196$TP6.653227@newsread2.prod.itd.earthlink.net>,
Alan Fishel <afishel@interurbans.com> wrote:
>sphinxangelorum@bigfoot.com wrote:
>> >The subject of electrification of Metrolink has come up ocasionally and
>> >San Francisco's Peninsula line will probably be electrified within a few
>> >years. When this is done, new locomotives will have to be bought. Has
>> >the decision been made as to what model to buy for San Francisco?
>>
>> I'm sure the JPB will buy the best that Lionel makes.
>--
>> Aaron Priven, Oakland, California, USA
>
>Yes just think if the JPB actually brought in some new Electric MU train
>sets or even bring in some modern cars like the Metrolink / Stockton San
>Jose cars to replace the museum pieces they currently operate.
Uh, huh. The complaints I hear about the SF-Gilroy commuter trains
is not that the cars are old, but that the trains are too slow and
they don't run frequently enough. Spending money on new cars might
be useful if you want the car builders to put pressure on the
legislature to upgrade the line, but the additional ridership coming
from new cars would be nothing compared to running faster and more
frequent service (like, umm, BART.)
>The ridership
>and usage would grow so fast the service might even operate on time and
>carry moor people faster because of the faster loading etc they would have a
>hard time selling a BART Line to San Jose.
If you're talking about the proposed extension of the Fremont line
down to San Jose, it's not very likely new cars on the SF side of
the bay will help for anyone who doesn't want to spend an additional
hour crossing the bay to get to them.
____
david parsons \bi/ Of course, running BART to San Jose would stop the
\/ favorite argument of the pro- vs anti- BART forces,
so this isn't likely to happen for a while.
Re: Electrification
Author: Silas Warner
Date: Mon, 09 Oct 2000 00:00
Date: Mon, 09 Oct 2000 00:00
24 lines
2039 bytes
2039 bytes
david parsons wrote: > > Uh, huh. The complaints I hear about the SF-Gilroy commuter trains > is not that the cars are old, but that the trains are too slow and > they don't run frequently enough. Spending money on new cars might > be useful if you want the car builders to put pressure on the > legislature to upgrade the line, but the additional ridership coming > from new cars would be nothing compared to running faster and more > frequent service (like, umm, BART.) > Caltrain is getting there, slowly. They've just increased weekdsy midday service to every half hour, which is just barely tolerable for folks used to BART. But Caltrain has been hamstrung by archaic union rules, or at least the perception that today's Caltrain must follow SP-era union rules. It wasn't too long ago that the rule was that a Caltrain set must make only two runs a day. With 68 trains on weekdays, Caltrain is now past that barrier and approaching 2 1/2 runs per trainset. By contrast, BART has a maximum of 58 trains makes 380 runs per day, or about 7 runs per trainset. Silas Warner
Call for Silas Warner fact check [was Re: Electrification]
Author: David Nebenzahl
Date: Mon, 09 Oct 2000 00:00
Date: Mon, 09 Oct 2000 00:00
14 lines
1329 bytes
1329 bytes
Silas Warner wrote: [...] > But Caltrain has been hamstrung by archaic union rules, or at least > the perception that today's Caltrain must follow SP-era union rules. > It wasn't too long ago that the rule was that a Caltrain set must make > only two runs a day. ... Anyone want to check (and possibly demonstrate as false) these 2 assertions of Silas'? So much of what we hear from him is pure speculation, fabulation or fabrication.
Re: Electrification
Author: Samuel G. Little
Date: Tue, 10 Oct 2000 00:00
Date: Tue, 10 Oct 2000 00:00
18 lines
1880 bytes
1880 bytes
david parsons wrote: > > Uh, huh. The complaints I hear about the SF-Gilroy commuter trains > is not that the cars are old, but that the trains are too slow and > they don't run frequently enough. Spending money on new cars might > be useful if you want the car builders to put pressure on the > legislature to upgrade the line, but the additional ridership coming > from new cars would be nothing compared to running faster and more > frequent service (like, umm, BART.) One good way to speed up the service is reducing dwell-time at the stations which have grown significantly over the last decade as ridership has increased (and due to bicycles and wheelchairs). Most of the 15 minute end-to-end travel time added to the Caltrain schedule could be eliminated with more doors and level boarding (like, umm, BART). - Sam.
Re: Electrification
Author: Michael Graff
Date: Tue, 10 Oct 2000 00:00
Date: Tue, 10 Oct 2000 00:00
16 lines
1586 bytes
1586 bytes
In article <39E2DFAB.EEBC14AE@compuserve.com>, SGwylan@aol.com wrote: > One good way to speed up the service is reducing dwell-time at the > stations which have grown significantly over the last decade as > ridership has increased (and due to bicycles and wheelchairs). Most of > the 15 minute end-to-end travel time added to the Caltrain schedule > could be eliminated with more doors and level boarding (like, umm, > BART). Like ACE? Ok, it's not quite level boarding, but bikes can be easily lifted up one step, and simple low-tech ramps provide wheelchair access. Sent via Deja.com http://www.deja.com/ Before you buy.
Re: Electrification
Author: Brian Mueller
Date: Tue, 10 Oct 2000 00:00
Date: Tue, 10 Oct 2000 00:00
1 lines
887 bytes
887 bytes
Looks like we all agree...BART technology is better.
Re: Electrification
Author: Samuel G. Little
Date: Wed, 11 Oct 2000 00:00
Date: Wed, 11 Oct 2000 00:00
20 lines
1882 bytes
1882 bytes
Michael Graff wrote: > > In article <39E2DFAB.EEBC14AE@compuserve.com>, > SGwylan@aol.com wrote: > > > One good way to speed up the service is reducing dwell-time at the > > stations which have grown significantly over the last decade as > > ridership has increased (and due to bicycles and wheelchairs). Most of > > the 15 minute end-to-end travel time added to the Caltrain schedule > > could be eliminated with more doors and level boarding (like, umm, > > BART). > > Like ACE? Ok, it's not quite level boarding, but bikes can be easily > lifted up one step, and simple low-tech ramps provide wheelchair access. Well, I'll aim for an ideal first (not the whole BART system, mind, but their boarding procedures work quite well), and be willing to negotiate down from there. <s> - Sam
Re: Electrification
Author: david parsons
Date: Thu, 12 Oct 2000 00:00
Date: Thu, 12 Oct 2000 00:00
22 lines
1739 bytes
1739 bytes
In article <a0m7usgtll3ksa1mbst2dqs1t42du688ra@4ax.com>,
Brian Mueller <seeker78x@hotmail.com> wrote:
>Looks like we all agree...BART technology is better.
Umm, which part of ``BART technology'' are you talking about?
Fare-paid platforms (which date from the 1890s), High-level platforms
(earlier than that; I'd guess they were being used in the 1850s),
electrification (1880s), single-man crews (1920s on trolley lines),
wide-gauge trains (1830s), frequent service (which dates from
whenever omnibusses started to operate) or automated train control?
The one thing that BARTification of the SP line would do is give
single-seat service to the eastbay and Market St. But if the 3rd
street streetcar line isn't Seattleld, the SP line will be close
enough to transit to make a recipe of more service, fare-paid
platforms, and single-man crews good enough for much of the
ridership.
____
david parsons \bi/ The big problem with single-man crews is there's
\/ no good way to apprentice motormen.
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads