Article View: sci.space
Article #1918NASA Headline News (Forwarded)
From: Ron Baalke
Date: Wed, 08 Nov 1989 19:58
Date: Wed, 08 Nov 1989 19:58
56 lines
3091 bytes
3091 bytes
-----------------------------------------------------------------
Wednesday, November 8, 1989 audio: 202/755-1788
-----------------------------------------------------------------
This is NASA headline news for Wednesday, November 8....
Taxi testing, takeoff, a captive flight and landing of the NASA
B-52 and the Pegasus air launched orbital booster is now
scheduled for Thursday at Edwards Air Force Base, Calif., weather
permitting. An attempt today was scrubbed. The test flight will
verify the integrity of the configuration prior to launch which
is expected sometime near the end of the year. If the test is
conducted tomorrow, a video tape replay of highlights is
scheduled for 4:00 p. m., eastern time, on NASA Select TV.
The Jet Propulsion Laboratory reports that the Galileo spacecraft
has operated well since it was deployed from the orbiter Atlantis
last month. The flight team is continuing checkout of elements
of the spacecraft. Galileo instruments detected and
characterized the recent major solar flare activity that began
october 19. The first trajectory correction is scheduled for
later this week. Project officials say that nothing so far has
ruled out the possibility of an encounter with the asteroid
Gaspra between the first and second earth flybys.
The solar flare in late October has inflicted some damage to the
Magellan spacecraft's solar panels and star sensor system. A JPL
spokesman told United Press International that highly charged
particles streaming from the sun caused the Venus-bound
spacecraft to lose two percent of its power and upset star
calibrations for about a week.
A NASA-NOAA geological team says the recent California earthquake
resulted in a crustral movement of about 2 inches near Fort Ord
in the San Francisco bay area. The data were obtained by mobile
very long baseline interferometry systems. The measurements
were taken immediately after the quake by Goddard Space Flight
Center and NOAA geodetic survey scientists who have been
monitoring sites along the San Andreas fault since 1972.
Preparations for the next space shuttle launch continue at
Kennedy Space Center. The flight readiness test on the main
propulsion system is being conducted today. Launch of the STS-33
mission is set for November 20.
Ron Baalke | (818) 541-2341 x260
Jet Propulsion Lab M/S 301-355 | baalke@mars.jpl.nasa.gov
4800 Oak Grove Dr. |
Pasadena, CA 91109 |
Technical Details
Message-ID:
<2119@jato.Jpl.Nasa.Gov>Path:
arc1-ca.pugleaf.net!utzoo!utgpu!jarvis.csri.toronto.edu!mailrus!wuarchive!cs.utexas.edu!usc!henry.jpl.nasa.gov!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalkeShow Full Headers
Complete Article Headers
Path: arc1-ca.pugleaf.net!utzoo!utgpu!jarvis.csri.toronto.edu!mailrus!wuarchive!cs.utexas.edu!usc!henry.jpl.nasa.gov!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke From: baalke@mars.jpl.nasa.gov (Ron Baalke) Newsgroups: sci.space,sci.space.shuttle Subject: NASA Headline News (Forwarded) Message-ID: <2119@jato.Jpl.Nasa.Gov> Date: 8 Nov 89 19:58:52 GMT Sender: news@jato.Jpl.Nasa.Gov Reply-To: baalke@mars.jpl.nasa.gov (Ron Baalke) Organization: Jet Propulsion Laboratory, Pasadena, CA. Lines: 56