Thread View: sci.stat.math
4 messages
4 total messages
Started by Georg Wütschner
Thu, 05 Jun 2003 17:01
estimation performance of independant estimators
Author: Georg Wütschner
Date: Thu, 05 Jun 2003 17:01
Date: Thu, 05 Jun 2003 17:01
29 lines
2858 bytes
2858 bytes
Hi folk, I hope you allow me as an engineer a basic question: a random variable (RV) takes on a certain value, which I have to estimate. To this end I have a set of values, each of which was produced by a given function of the RV plus noise. Now an estimator E1 estimates the value of my RV with a certain variance V1. An _independant_ second estimator E2 does the same, but has a much worse set of values and therefore estimates with a bigger variance V2. What would interest me is a statement on whether I can improve the overall performance of my estimation by somehow combining the 2 estimators or if I allways make it worse. That is, is it possible to achieve a variance lower than V2 when combining the result of E1 and that of E2 (say weighted average or something more sophisticated)?? Can this wanted relation between V1, V2 and Vcomb. be mathematically expressed? What are the conditions/constrictions? Maybe something which could point in the same direction was the so called weather problem a friend told me of: If one weather station states that tomorrow it will rain with a probability of 60%, and a second, which operates which totally different methods (->independent), predicts rain wiht 70% prob., then one can somehow calulate that it will rain with a prob. of, say, 80% (higher than the higher of the two)... any idea how this works? Thanks a lot, Georg
Re: estimation performance of independant estimators
Author: Robert Dodier
Date: Sat, 07 Jun 2003 15:43
Date: Sat, 07 Jun 2003 15:43
29 lines
2449 bytes
2449 bytes
Georg W�tschner <georg.wuetschner@unibw-muenchen.de> wrote: [...] > Maybe something which could point in the same direction was the so > called weather problem a friend told me of: > If one weather station states that tomorrow it will rain with a > probability of 60%, and a second, which operates which totally different > methods (->independent), predicts rain wiht 70% prob., then one can > somehow calulate that it will rain with a prob. of, say, 80% (higher > than the higher of the two)... any idea how this works? If I'm not mistaken, the combined probability (whatever scheme you find for doing the combining) will be a convex linear combination of the individual probabilities, i.e., a linear combination of the form sum_i a_i p_i, with all a_i >= 0 and sum_i a_i = 1. This implies that the combined probability must be somewhere between the least and greatest individual probabilities. I think the topic you want to look into is called "combining experts" or "combining opinions". Here is a reference: Genest, C. and Zidek, J. V. (1986), "Combining Probability Distributions: A Critique and an Annotated Bibliography," Statistical Science 1 114--135. For what it's worth, Robert Dodier -- ``Prediction is extremely difficult. Especially about the future.'' -- Niels Bohr
Re: estimation performance of independant estimators
Author: Ray Koopman
Date: Sun, 08 Jun 2003 18:36
Date: Sun, 08 Jun 2003 18:36
37 lines
2713 bytes
2713 bytes
Georg W�tschner <georg.wuetschner@unibw-muenchen.de> wrote in message news:<3EDF7781.4030100@unibw-muenchen.de>... > Hi folk, > I hope you allow me as an engineer a basic question: > a random variable (RV) takes on a certain value, which I have to > estimate. To this end I have a set of values, each of which was produced > by a given function of the RV plus noise. > Now an estimator E1 estimates the value of my RV with a certain variance V1. > An _independant_ second estimator E2 does the same, but has a much worse > set of values and therefore estimates with a bigger variance V2. > > What would interest me is a statement on whether I can improve the > overall performance of my estimation by somehow combining the 2 > estimators or if I allways make it worse. That is, is it possible to > achieve a variance lower than V2 when combining the result of E1 and > that of E2 (say weighted average or something more sophisticated)?? > Can this wanted relation between V1, V2 and Vcomb. be mathematically > expressed? What are the conditions/constrictions? > > [ snip ] > > Thanks a lot, > > Georg To avoid confusion with the expected value operator E, call the estimates X1 and X2. Then we have E(X1|RV) = RV, Var(X1|RV) = V1, E(X2|RV) = RV, Var(X2|RV) = V2, with X1|RV independent of X2|RV. Let Xcomb = P1*X1 + P2*X2, where P1 = (1/V1)/(1/V1 + 1/V2), P2 = (1/V2)/(1/V1 + 1/V2). Then E(Xcomb|RV) = RV, and Var(Xcomb|RV) = V1*V2/(V1+V2), which is less than both V1 and V2. But note that V1 and V2 must be known (as opposed to estimated).
Re: estimation performance of independant estimators
Author: Robert Israel
Date: Sun, 08 Jun 2003 20:53
Date: Sun, 08 Jun 2003 20:53
34 lines
2180 bytes
2180 bytes
In article <242be6f5.0306081036.7e5fcaf1@posting.google.com>, Ray Koopman <koopman@sfu.ca> wrote: >To avoid confusion with the expected value operator E, >call the estimates X1 and X2. Then we have >E(X1|RV) = RV, Var(X1|RV) = V1, >E(X2|RV) = RV, Var(X2|RV) = V2, >with X1|RV independent of X2|RV. >Let Xcomb = P1*X1 + P2*X2, where >P1 = (1/V1)/(1/V1 + 1/V2), >P2 = (1/V2)/(1/V1 + 1/V2). >Then E(Xcomb|RV) = RV, >and Var(Xcomb|RV) = V1*V2/(V1+V2), >which is less than both V1 and V2. >But note that V1 and V2 must be known >(as opposed to estimated). But using reasonably good estimates for V1 and V2 will probably still work. Say Xcomb = t X1 + (1-t) X2 Var(Xcomb|RV) = t^2 V1 + (1-t)^2 V2 which is less than both V1 and V2 as long as max(0,(V2-V1)/(V1+V2)) < t < min(1,(2 V2)/(V1+ V2)) Robert Israel israel@math.ubc.ca Department of Mathematics http://www.math.ubc.ca/~israel University of British Columbia Vancouver, BC, Canada V6T 1Z2
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads