Cambridge-Ely wires (were) down
Author: Theo Markettos
Date: Tue, 30 Jun 2009 21:42
Date: Tue, 30 Jun 2009 21:42
14 lines
1539 bytes
1539 bytes
Since yesterday trains have been suspended between Cambridge and Ely 'due to overhead line problems'. Services were supposed to be getting back to normal this evening, but the details are a bit puzzling... Yesterday there was a replacement bus between Cambridge and Ely. There was the implication that trains were running between Ely and King's Lynn. But as the only electrical supply point north of Cambridge is at Milton (N.Camb), how were trains powered? Since FCC is an entirely electric railway, dieselising isn't possible. Or did NXEA lend them some DMUs? Or was the whole lot bustituted? Wasn't looking fun for those I arrived with in Cambridge in the evening peak. Theo
Re: Cambridge-Ely wires (were) down
Author: Espen Koht
Date: Wed, 01 Jul 2009 09:38
Date: Wed, 01 Jul 2009 09:38
20 lines
1878 bytes
1878 bytes
In article <pyb*RgQKs@news.chiark.greenend.org.uk>, Theo Markettos <theom+news@chiark.greenend.org.uk> wrote: > Since yesterday trains have been suspended between Cambridge and Ely 'due to > overhead line problems'. Services were supposed to be getting back to > normal this evening, but the details are a bit puzzling... > > Yesterday there was a replacement bus between Cambridge and Ely. There was > the implication that trains were running between Ely and King's Lynn. But > as the only electrical supply point north of Cambridge is at Milton > (N.Camb), how were trains powered? Since FCC is an entirely electric > railway, dieselising isn't possible. Or did NXEA lend them some DMUs? > > Or was the whole lot bustituted? Wasn't looking fun for those I arrived > with in Cambridge in the evening peak. Reports from an Ely - Cambridge commuter have been that the overhead line problem was due to 'sagging lines'. Initially no trains were running, but eventually the non-electric services restarted while the FCC services continued to be bus substituted.
Re: Cambridge-Ely wires (were) down
Author: PaulB
Date: Wed, 01 Jul 2009 22:51
Date: Wed, 01 Jul 2009 22:51
33 lines
2945 bytes
2945 bytes
Phil W Lee wrote: > Espen Koht <ehk20@cam.ac.uk> considered Wed, 01 Jul 2009 10:38:36 > +0100 the perfect time to write: > >> In article <pyb*RgQKs@news.chiark.greenend.org.uk>, >> Theo Markettos <theom+news@chiark.greenend.org.uk> wrote: >> >>> Since yesterday trains have been suspended between Cambridge and Ely 'due to >>> overhead line problems'. Services were supposed to be getting back to >>> normal this evening, but the details are a bit puzzling... >>> >>> Yesterday there was a replacement bus between Cambridge and Ely. There was >>> the implication that trains were running between Ely and King's Lynn. But >>> as the only electrical supply point north of Cambridge is at Milton >>> (N.Camb), how were trains powered? Since FCC is an entirely electric >>> railway, dieselising isn't possible. Or did NXEA lend them some DMUs? >>> >>> Or was the whole lot bustituted? Wasn't looking fun for those I arrived >>> with in Cambridge in the evening peak. >> Reports from an Ely - Cambridge commuter have been that the overhead >> line problem was due to 'sagging lines'. Initially no trains were >> running, but eventually the non-electric services restarted while the >> FCC services continued to be bus substituted. > > It must have been the wrong kind of heat. Reminds of a children's book from x years ago showing the effect on telephone wires between poles in winter and summer. Winter, taught, nearly horizontal - summer, sagging. I thought those piles of weights on a pulley system at the uprights were designed to compensate for expansion and contraction. Paul
Re: Cambridge-Ely wires (were) down
Author: Charles Ellson
Date: Wed, 01 Jul 2009 23:57
Date: Wed, 01 Jul 2009 23:57
42 lines
3467 bytes
3467 bytes
On Wed, 01 Jul 2009 23:51:02 +0100, PaulB <abc@xyz.com> wrote: >Phil W Lee wrote: >> Espen Koht <ehk20@cam.ac.uk> considered Wed, 01 Jul 2009 10:38:36 >> +0100 the perfect time to write: >> >>> In article <pyb*RgQKs@news.chiark.greenend.org.uk>, >>> Theo Markettos <theom+news@chiark.greenend.org.uk> wrote: >>> >>>> Since yesterday trains have been suspended between Cambridge and Ely 'due to >>>> overhead line problems'. Services were supposed to be getting back to >>>> normal this evening, but the details are a bit puzzling... >>>> >>>> Yesterday there was a replacement bus between Cambridge and Ely. There was >>>> the implication that trains were running between Ely and King's Lynn. But >>>> as the only electrical supply point north of Cambridge is at Milton >>>> (N.Camb), how were trains powered? Since FCC is an entirely electric >>>> railway, dieselising isn't possible. Or did NXEA lend them some DMUs? >>>> >>>> Or was the whole lot bustituted? Wasn't looking fun for those I arrived >>>> with in Cambridge in the evening peak. >>> Reports from an Ely - Cambridge commuter have been that the overhead >>> line problem was due to 'sagging lines'. Initially no trains were >>> running, but eventually the non-electric services restarted while the >>> FCC services continued to be bus substituted. >> >> It must have been the wrong kind of heat. > >Reminds of a children's book from x years ago showing the effect on >telephone wires between poles in winter and summer. Winter, taught, >nearly horizontal - summer, sagging. I thought those piles of weights >on a pulley system at the uprights were designed to compensate for >expansion and contraction. > They can only cope with a particular temperature range. If the temperature becomes very hot or very cold and the OHLE section is very long then it is possible for the weights to be pulled all the way up (twang!) in very cold weather or to rest on the bottom of the rack and de-tension the wire in very hot weather. In many (most?) cases the OHLE sections are sufficiently short enough that neither extreme is reached but a long section might suffer this problem if no adjustments are made between the seasons to allow for it.
Re: Cambridge-Ely wires (were) down
Author: Brian Watson
Date: Thu, 02 Jul 2009 06:41
Date: Thu, 02 Jul 2009 06:41
17 lines
1665 bytes
1665 bytes
Charles Ellson wrote: > They can only cope with a particular temperature range. If the > temperature becomes very hot or very cold and the OHLE section is very > long then it is possible for the weights to be pulled all the way up > (twang!) in very cold weather or to rest on the bottom of the rack and > de-tension the wire in very hot weather. So a simple solution is to move the bump stop down so the weights can drop lower. For lack of that, the trains are disrupted. -- Brian "Fight like the Devil, die like a gentleman." www.imagebus.co.uk/shop
Re: Cambridge-Ely wires (were) down
Author: Roland Perry
Date: Thu, 02 Jul 2009 06:44
Date: Thu, 02 Jul 2009 06:44
10 lines
1983 bytes
1983 bytes
In message <yLR2m.315$uV3.43@newsfe22.ams2>, at 23:51:02 on Wed, 1 Jul 2009, PaulB <abc@xyz.com> remarked: >I thought those piles of weights on a pulley system at the uprights >were designed to compensate for expansion and contraction. The problem seems to be that while the weights and pulleys do compensate for "normal" temperature fluctuations they don't always cope with the sort of fluctuations we are having this week :( -- Roland Perry
Re: Cambridge-Ely wires (were) down
Author: tony sayer
Date: Thu, 02 Jul 2009 10:47
Date: Thu, 02 Jul 2009 10:47
52 lines
3954 bytes
3954 bytes
In article <6ftn45da3i5j9rt630njgvife0lon078r1@4ax.com>, Charles Ellson <charles@ellson.demon.co.uk> scribeth thus >On Wed, 01 Jul 2009 23:51:02 +0100, PaulB <abc@xyz.com> wrote: > >>Phil W Lee wrote: >>> Espen Koht <ehk20@cam.ac.uk> considered Wed, 01 Jul 2009 10:38:36 >>> +0100 the perfect time to write: >>> >>>> In article <pyb*RgQKs@news.chiark.greenend.org.uk>, >>>> Theo Markettos <theom+news@chiark.greenend.org.uk> wrote: >>>> >>>>> Since yesterday trains have been suspended between Cambridge and Ely 'due >to >>>>> overhead line problems'. Services were supposed to be getting back to >>>>> normal this evening, but the details are a bit puzzling... >>>>> >>>>> Yesterday there was a replacement bus between Cambridge and Ely. There was >>>>> the implication that trains were running between Ely and King's Lynn. But >>>>> as the only electrical supply point north of Cambridge is at Milton >>>>> (N.Camb), how were trains powered? Since FCC is an entirely electric >>>>> railway, dieselising isn't possible. Or did NXEA lend them some DMUs? >>>>> >>>>> Or was the whole lot bustituted? Wasn't looking fun for those I arrived >>>>> with in Cambridge in the evening peak. >>>> Reports from an Ely - Cambridge commuter have been that the overhead >>>> line problem was due to 'sagging lines'. Initially no trains were >>>> running, but eventually the non-electric services restarted while the >>>> FCC services continued to be bus substituted. >>> >>> It must have been the wrong kind of heat. >> >>Reminds of a children's book from x years ago showing the effect on >>telephone wires between poles in winter and summer. Winter, taught, >>nearly horizontal - summer, sagging. I thought those piles of weights >>on a pulley system at the uprights were designed to compensate for >>expansion and contraction. >> >They can only cope with a particular temperature range. If the >temperature becomes very hot or very cold and the OHLE section is very >long then it is possible for the weights to be pulled all the way up >(twang!) in very cold weather or to rest on the bottom of the rack and >de-tension the wire in very hot weather. In many (most?) cases the >OHLE sections are sufficiently short enough that neither extreme is >reached but a long section might suffer this problem if no adjustments >are made between the seasons to allow for it. Heath Robinson mode = on.. Couldn't they just have two sets of weights one at either end twice the capacity then;?.. -- Tony Sayer
Re: Cambridge-Ely wires (were) down
Author: bob
Date: Thu, 02 Jul 2009 11:56
Date: Thu, 02 Jul 2009 11:56
77 lines
4771 bytes
4771 bytes
On 2 July, 12:47, tony sayer <t...@bancom.co.uk> wrote: > In article <6ftn45da3i5j9rt630njgvife0lon07...@4ax.com>, Charles Ellson > <char...@ellson.demon.co.uk> scribeth thus > > > > > > >On Wed, 01 Jul 2009 23:51:02 +0100, PaulB <a...@xyz.com> wrote: > > >>Phil W Lee wrote: > >>> Espen Koht <eh...@cam.ac.uk> considered Wed, 01 Jul 2009 10:38:36 > >>> +0100 the perfect time to write: > > >>>> In article <pyb*Rg...@news.chiark.greenend.org.uk>, > >>>> Theo Markettos <theom+n...@chiark.greenend.org.uk> wrote: > > >>>>> Since yesterday trains have been suspended between Cambridge and Ely 'due > >to > >>>>> overhead line problems'. Services were supposed to be getting back to > >>>>> normal this evening, but the details are a bit puzzling... > > >>>>> Yesterday there was a replacement bus between Cambridge and Ely. There was > >>>>> the implication that trains were running between Ely and King's Lynn. But > >>>>> as the only electrical supply point north of Cambridge is at Milton > >>>>> (N.Camb), how were trains powered? Since FCC is an entirely electric > >>>>> railway, dieselising isn't possible. Or did NXEA lend them some DMUs? > > >>>>> Or was the whole lot bustituted? Wasn't looking fun for those I arrived > >>>>> with in Cambridge in the evening peak. > >>>> Reports from an Ely - Cambridge commuter have been that the overhead > >>>> line problem was due to 'sagging lines'. Initially no trains were > >>>> running, but eventually the non-electric services restarted while the > >>>> FCC services continued to be bus substituted. > > >>> It must have been the wrong kind of heat. > > >>Reminds of a children's book from x years ago showing the effect on > >>telephone wires between poles in winter and summer. Winter, taught, > >>nearly horizontal - summer, sagging. I thought those piles of weights > >>on a pulley system at the uprights were designed to compensate for > >>expansion and contraction. > > >They can only cope with a particular temperature range. If the > >temperature becomes very hot or very cold and the OHLE section is very > >long then it is possible for the weights to be pulled all the way up > >(twang!) in very cold weather or to rest on the bottom of the rack and > >de-tension the wire in very hot weather. In many (most?) cases the > >OHLE sections are sufficiently short enough that neither extreme is > >reached but a long section might suffer this problem if no adjustments > >are made between the seasons to allow for it. > > Heath Robinson mode = on.. > > Couldn't they just have two sets of weights one at either end twice the > capacity then;?.. Essentially, that is what they do. At the midpoint of the section, the wire is attached to a fixed point, with two balanced sections either side, each with a weight on the end (if you look out the window on the way up to the Cross, you can see the arrangement). From my understanding of temperatures (NB I'm not in the UK right now), the temperatures are not atypical for recent summers (certainly not as hot as '03), so it would seem to me that dropping the bumpers, or using double racks for the weights (so that the stack is half the height) to get more travel would be a prudent move. Robin
Re: Cambridge-Ely wires (were) down
Author: tony sayer
Date: Thu, 02 Jul 2009 17:18
Date: Thu, 02 Jul 2009 17:18
81 lines
5119 bytes
5119 bytes
In article <c5c8f288-92af-450b-9051-bb0bc051c223@r10g2000yqa.googlegroup
s.com>, bob <rcp27g@gmail.com> scribeth thus
>On 2 July, 12:47, tony sayer <t...@bancom.co.uk> wrote:
>> In article <6ftn45da3i5j9rt630njgvife0lon07...@4ax.com>, Charles Ellson
>> <char...@ellson.demon.co.uk> scribeth thus
>>
>>
>>
>>
>>
>> >On Wed, 01 Jul 2009 23:51:02 +0100, PaulB <a...@xyz.com> wrote:
>>
>> >>Phil W Lee wrote:
>> >>> Espen Koht <eh...@cam.ac.uk> considered Wed, 01 Jul 2009 10:38:36
>> >>> +0100 the perfect time to write:
>>
>> >>>> In article <pyb*Rg...@news.chiark.greenend.org.uk>,
>> >>>> Theo Markettos <theom+n...@chiark.greenend.org.uk> wrote:
>>
>> >>>>> Since yesterday trains have been suspended between Cambridge and Ely
>'due
>> >to
>> >>>>> overhead line problems'. �Services were supposed to be getting back to
>> >>>>> normal this evening, but the details are a bit puzzling...
>>
>> >>>>> Yesterday there was a replacement bus between Cambridge and Ely. �There
>was
>> >>>>> the implication that trains were running between Ely and King's Lynn.
>�But
>> >>>>> as the only electrical supply point north of Cambridge is at Milton
>> >>>>> (N.Camb), how were trains powered? �Since FCC is an entirely electric
>> >>>>> railway, dieselising isn't possible. �Or did NXEA lend them some DMUs?
>>
>> >>>>> Or was the whole lot bustituted? �Wasn't looking fun for those I arrived
>> >>>>> with in Cambridge in the evening peak.
>> >>>> Reports from an Ely - Cambridge commuter have been that the overhead
>> >>>> line problem was due to 'sagging lines'. Initially no trains were
>> >>>> running, but eventually the non-electric services restarted while the
>> >>>> FCC services continued to be bus substituted.
>>
>> >>> It must have been the wrong kind of heat.
>>
>> >>Reminds of a children's book from x years ago showing the effect on
>> >>telephone wires between poles in winter and summer. �Winter, taught,
>> >>nearly horizontal - summer, sagging. �I thought those piles of weights
>> >>on a pulley system at the uprights were designed to compensate for
>> >>expansion and contraction.
>>
>> >They can only cope with a particular temperature range. If the
>> >temperature becomes very hot or very cold and the OHLE section is very
>> >long then it is possible for the weights to be pulled all the way up
>> >(twang!) in very cold weather or to rest on the bottom of the rack and
>> >de-tension the wire in very hot weather. In many (most?) cases the
>> >OHLE sections are sufficiently short enough that neither extreme is
>> >reached but a long section might suffer this problem if no adjustments
>> >are made between the seasons to allow for it.
>>
>> Heath Robinson mode = on..
>>
>> Couldn't they just have two sets of weights one at either end twice the
>> capacity then;?..
>
>Essentially, that is what they do. At the midpoint of the section,
>the wire is attached to a fixed point, with two balanced sections
>either side, each with a weight on the end (if you look out the window
>on the way up to the Cross, you can see the arrangement). From my
>understanding of temperatures (NB I'm not in the UK right now), the
>temperatures are not atypical for recent summers (certainly not as hot
>as '03), so it would seem to me that dropping the bumpers, or using
>double racks for the weights (so that the stack is half the height) to
>get more travel would be a prudent move.
>
>Robin
Perhaps they ought to dig 'n 'ole for the OLE and let the weight go down
that when its 'ot;))..
--
Tony Sayer
Re: Cambridge-Ely wires (were) down
Author: Espen Koht
Date: Thu, 02 Jul 2009 20:12
Date: Thu, 02 Jul 2009 20:12
19 lines
1999 bytes
1999 bytes
In article <umbo45pff29tlokd1pnac7an5so4gfi4c1@4ax.com>, Phil W Lee <phil(at)lee-family(dot)me(dot)uk> wrote: > >They can only cope with a particular temperature range. If the > >temperature becomes very hot or very cold and the OHLE section is very > >long then it is possible for the weights to be pulled all the way up > >(twang!) in very cold weather or to rest on the bottom of the rack and > >de-tension the wire in very hot weather. In many (most?) cases the > >OHLE sections are sufficiently short enough that neither extreme is > >reached but a long section might suffer this problem if no adjustments > >are made between the seasons to allow for it. > > So what it all comes down to is the inability of Network Rail > maintenance to read weather forecasts. > Nothing new there then. Or the design the system properly in the first place. Somehow I suspect they have wider ranges of temperature variation in a number of other countries with electric trains operating from overhead lines.
Re: Cambridge-Ely wires (were) down
Author: Charles Ellson
Date: Thu, 02 Jul 2009 22:58
Date: Thu, 02 Jul 2009 22:58
24 lines
2339 bytes
2339 bytes
On Thu, 2 Jul 2009 07:41:50 +0100, "Brian Watson" <Brian@imagebus.co.uk> wrote: >Charles Ellson wrote: > >> They can only cope with a particular temperature range. If the >> temperature becomes very hot or very cold and the OHLE section is very >> long then it is possible for the weights to be pulled all the way up >> (twang!) in very cold weather or to rest on the bottom of the rack and >> de-tension the wire in very hot weather. > >So a simple solution is to move the bump stop down so the weights can drop >lower. > That would often involve removing some metalwork and digging a hole. A simpler method would be to have a link (painted a bright colour to make it visible in winter) somewhere in the last bit of cable attached to the pulley which could be removed in the summer. >For lack of that, the trains are disrupted. > In most places the measure is not necessary. In other places the problem occurs so seldom that less disruption would be caused by imposing a temporary speed limit.
Re: Cambridge-Ely wires (were) down
Author: PaulB
Date: Fri, 03 Jul 2009 08:23
Date: Fri, 03 Jul 2009 08:23
11 lines
1726 bytes
1726 bytes
PaulB wrote: <snip> > Reminds of a children's book from x years ago showing the effect on > telephone wires between poles in winter and summer. Winter, taught, > nearly horizontal - summer, sagging. I thought those piles of weights > on a pulley system at the uprights were designed to compensate for > expansion and contraction. > > Paul <bugger>taught != taut</bugger>
Re: Cambridge-Ely wires (were) down
Author: Brian Watson
Date: Sat, 04 Jul 2009 14:36
Date: Sat, 04 Jul 2009 14:36
42 lines
2664 bytes
2664 bytes
Charles Ellson wrote: > On Thu, 2 Jul 2009 07:41:50 +0100, "Brian Watson" > <Brian@imagebus.co.uk> wrote: > >> Charles Ellson wrote: >> >>> They can only cope with a particular temperature range. If the >>> temperature becomes very hot or very cold and the OHLE section is >>> very long then it is possible for the weights to be pulled all the >>> way up (twang!) in very cold weather or to rest on the bottom of >>> the rack and de-tension the wire in very hot weather. >> >> So a simple solution is to move the bump stop down so the weights >> can drop lower. >> > That would often involve removing some metalwork and digging a hole. Beyond their ability, then. :-\ > A > simpler method would be to have a link (painted a bright colour to > make it visible in winter) somewhere in the last bit of cable attached > to the pulley which could be removed in the summer. Bearing in mind the interruptions to service each time such links needed to be moved, I fail to see how that is simpler. >> For lack of that, the trains are disrupted. >> > In most places the measure is not necessary. In other places the > problem occurs so seldom that less disruption would be caused by > imposing a temporary speed limit. As it is likely to be more frequent in future, It'd seem pretty smart to modify the system now. -- Brian "Fight like the Devil, die like a gentleman." www.imagebus.co.uk/shop
Re: Cambridge-Ely wires (were) down
Author: Roland Perry
Date: Sat, 04 Jul 2009 14:54
Date: Sat, 04 Jul 2009 14:54
15 lines
1730 bytes
1730 bytes
In message <7b97n1F22jho7U1@mid.individual.net>, at 15:36:12 on Sat, 4 Jul 2009, Brian Watson <Brian@imagebus.co.uk> remarked: >>> So a simple solution is to move the bump stop down so the weights >>> can drop lower. >>> >> That would often involve removing some metalwork and digging a hole. > >Beyond their ability, then. Most of the hole would be dug through the concrete foundation for the pole (assuming the pole isn't fixed on a bridge parapet etc, in which case you might be digging through bridge decking or whatever) -- Roland Perry
Re: Cambridge-Ely wires (were) down
Author: Charles Ellson
Date: Sun, 05 Jul 2009 05:52
Date: Sun, 05 Jul 2009 05:52
58 lines
3657 bytes
3657 bytes
On Sat, 04 Jul 2009 23:37:54 +0100, Phil W Lee <phil(at)lee-family(dot)me(dot)uk> wrote: >"Brian Watson" <Brian@imagebus.co.uk> considered Sat, 4 Jul 2009 >15:36:12 +0100 the perfect time to write: > >>Charles Ellson wrote: >>> On Thu, 2 Jul 2009 07:41:50 +0100, "Brian Watson" >>> <Brian@imagebus.co.uk> wrote: >>> >>>> Charles Ellson wrote: >>>> >>>>> They can only cope with a particular temperature range. If the >>>>> temperature becomes very hot or very cold and the OHLE section is >>>>> very long then it is possible for the weights to be pulled all the >>>>> way up (twang!) in very cold weather or to rest on the bottom of >>>>> the rack and de-tension the wire in very hot weather. >>>> >>>> So a simple solution is to move the bump stop down so the weights >>>> can drop lower. >>>> >>> That would often involve removing some metalwork and digging a hole. >> >>Beyond their ability, then. >> >>:-\ >> >>> A >>> simpler method would be to have a link (painted a bright colour to >>> make it visible in winter) somewhere in the last bit of cable attached >>> to the pulley which could be removed in the summer. >> >>Bearing in mind the interruptions to service each time such links needed to >>be moved, I fail to see how that is simpler. > >If you use a pair of blocks on the insulated side, you can wind them >in or out without interupting service at all. > I would have thought it unlikely that there would not be some period when the line would be closed anyway for various other periodic tasks. >> >>>> For lack of that, the trains are disrupted. >>>> >>> In most places the measure is not necessary. In other places the >>> problem occurs so seldom that less disruption would be caused by >>> imposing a temporary speed limit. >> >>As it is likely to be more frequent in future, It'd seem pretty smart to >>modify the system now. > >Using larger diameter weights would mean a shorter stack of them, >meaning the existing system would have more range. > For those type of weights there might also be some scope for adding a couple of guides and putting "ears" on the weights (making them vaguely like the LT symbol) to further reduce the height of the bundle.
Re: Cambridge-Ely wires (were) down
Author: Brian Watson
Date: Mon, 06 Jul 2009 16:20
Date: Mon, 06 Jul 2009 16:20
16 lines
1741 bytes
1741 bytes
Phil W Lee wrote: > "Brian Watson" <Brian@imagebus.co.uk> considered Sat, 4 Jul 2009 > 15:36:12 +0100 the perfect time to write: >> As it is likely to be more frequent in future, It'd seem pretty >> smart to modify the system now. > > Using larger diameter weights would mean a shorter stack of them, > meaning the existing system would have more range. Great idea. -- Brian "Fight like the Devil, die like a gentleman." www.imagebus.co.uk/shop
Re: Cambridge-Ely wires (were) down
Author: Brian Watson
Date: Mon, 06 Jul 2009 16:23
Date: Mon, 06 Jul 2009 16:23
27 lines
2348 bytes
2348 bytes
Charles Ellson wrote: > On Sat, 04 Jul 2009 23:37:54 +0100, Phil W Lee > <phil(at)lee-family(dot)me(dot)uk> wrote: > >> "Brian Watson" <Brian@imagebus.co.uk> considered Sat, 4 Jul 2009 >>>> A >>>> simpler method would be to have a link (painted a bright colour to >>>> make it visible in winter) somewhere in the last bit of cable >>>> attached to the pulley which could be removed in the summer. >>> >>> Bearing in mind the interruptions to service each time such links >>> needed to be moved, I fail to see how that is simpler. >> >> If you use a pair of blocks on the insulated side, you can wind them >> in or out without interupting service at all. >> > I would have thought it unlikely that there would not be some period > when the line would be closed anyway for various other periodic tasks. Sure, but this would be one more that needed human intervention. An automatically-triggered solution is what's needed. -- Brian "Fight like the Devil, die like a gentleman." www.imagebus.co.uk/shop
Re: Cambridge-Ely wires (were) down
Author: Roland Perry
Date: Mon, 06 Jul 2009 16:30
Date: Mon, 06 Jul 2009 16:30
10 lines
1662 bytes
1662 bytes
In message <7bemjhF22tdglU1@mid.individual.net>, at 17:20:59 on Mon, 6 Jul 2009, Brian Watson <Brian@imagebus.co.uk> remarked: >> Using larger diameter weights would mean a shorter stack of them, >> meaning the existing system would have more range. > >Great idea. And if the resulting extra weight snaps the wires? -- Roland Perry
Re: Cambridge-Ely wires (were) down
Author: PaulB
Date: Mon, 06 Jul 2009 17:42
Date: Mon, 06 Jul 2009 17:42
18 lines
2200 bytes
2200 bytes
Roland Perry wrote: > In message <7bemjhF22tdglU1@mid.individual.net>, at 17:20:59 on Mon, 6 > Jul 2009, Brian Watson <Brian@imagebus.co.uk> remarked: >>> Using larger diameter weights would mean a shorter stack of them, >>> meaning the existing system would have more range. >> >> Great idea. > > And if the resulting extra weight snaps the wires? You're at it again, misunderstanding perfectly clear english in pursuit of an extended thread. It says, and I quote, "a shorter stack of them, meaning the exisitn gsystem would have more range." It does not say, heavier weights. Have you read all the preceding posts? Paul
Re: Cambridge-Ely wires (were) down
Author: Roland Perry
Date: Mon, 06 Jul 2009 18:22
Date: Mon, 06 Jul 2009 18:22
20 lines
2099 bytes
2099 bytes
In message <nIq4m.27502$wR3.11273@newsfe21.ams2>, at 18:42:42 on Mon, 6 Jul 2009, PaulB <abc@xyz.com> remarked: >>>> Using larger diameter weights would mean a shorter stack of them, >>>> meaning the existing system would have more range. >>> >>> Great idea. >> And if the resulting extra weight snaps the wires? > >You're at it again, misunderstanding perfectly clear english in pursuit >of an extended thread. > >It says, and I quote, "a shorter stack of them, meaning the exisitn >gsystem would have more range." It does not say, heavier weights. OK, I was thinking you would want to reduce the movement by (eg) doubling both the weight and the pulley "gearing". But you were wanting to increase the range merely by making the weights more compact. -- Roland Perry
Re: Cambridge-Ely wires (were) down
Author: Brian Watson
Date: Tue, 07 Jul 2009 19:48
Date: Tue, 07 Jul 2009 19:48
16 lines
1716 bytes
1716 bytes
Roland Perry wrote: > In message <7bemjhF22tdglU1@mid.individual.net>, at 17:20:59 on Mon, 6 > Jul 2009, Brian Watson <Brian@imagebus.co.uk> remarked: >>> Using larger diameter weights would mean a shorter stack of them, >>> meaning the existing system would have more range. >> >> Great idea. > > And if the resulting extra weight snaps the wires? :-) -- Brian "Fight like the Devil, die like a gentleman." www.imagebus.co.uk/shop
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads